Some features of this site are not compatible with older versions of Internet Explorer. Upgrade your browser or install Google Chrome Frame to better experience this site.

18th Annual Bridge Symposium

Full Registration

$395 members 
$495 nonmembers

  • Includes all 8 hours of education
  • Access to the recordings for 1 Year
  • Each seminar purchase is per office location. Operating remotely? Click here to learn how to accommodate multiple users
  • Not included in NCSEA's Webinar Subscription Plan

 

The information is critical to practicing structural engineers, trained designers, plan review agencies, professors and students from across the nation as you can all learn from examples of designs engineered to perform.

 

 

 

 

The Structural Engineers Association of Illinois (SEAOI) and NCSEA have teamed up to deliver the 18th Annual Bridge Symposium virtually. This much-anticipated and highly-acclaimed Symposium provides a forum for engineers to share and learn bridge analysis, design, and construction ideas from recent project successes and failures. LEARN FROM THE BEST & BRIGHTEST BRIDGE DESIGNERS!

 

July 8th – Day 1

  • Keynote: Utah Department of Transportation Bridge Program
  • 45th Street Grade Separation
  • Structural Solutions to Challenges with Replacement of the North Washington Street Bridge over the Boston Inner Harbor 
  • Brent Spence Bridge Fire and Rehabilitation


July 15th – Day 2

  • US 54 Canadian River Bridge, Logan, New Mexico
  • Jefferson-7 Bridge Bearing Replacement Evaluation
  • Guidance for Navigating Routine Steel Bridge Design
  • A Bascule Within a Bascule: Replacement of the Hinged Sidewalk on Lake Shore Drive Bascule Bridge
  • Transition in Superelevation: I-490/I-90 Interchange Ramp Bridges


July 22nd – Day 3

  • TRRA Merchants Bridge Main Span and East Approach Replacement/Retrofit
  • Hanging on to the Past - Modeling and Load Rating of Existing Pin & Hanger Bridges
  • Frances Appleton Pedestrian Bridge, A Case Study in Leveraging Cast Steel Connections for the US Steel Bridge Community 
  • California High Speed Rail Construction Package 2-3 – SR-43 Concrete Tied Arch Bridge


July 29th – Day 4

  • Seismic Evaluation of Typical IDOT Bridges using Displacement Based Principles and IDOT Policy Seismic Update
  • Infusing a New Life to the Pulaski Skyway
  • Highway Traffic Loading – AASHTO Compared to Other Codes of Practice
  • Design of the CTA Red-Purple Bypass